[Click on images to ENLARGE them].
The Mirrer Yeshiva (USA) has started “phase 2” of major renovations to? the Yeshiva Building. They have started demolition and renovation of the Bais Medrash and are slated to be finished in time for the Elul Z’man. The Yeshiva has moved upstairs into the High School Bais Medrash for the remainder of this Z’man.
Phase 2 includes: Replacing the Aron Kodesh, the HVAC system, lighting fixtures, doors, windows & Seforim Shranks.
The next stages which are actively in design and planning will include: New fa�ade on the entire building, 100 bed Bais Medrash dormitory, new High School classrooms and Bais Medrash on top of the existing building, and a new main entrance to the Yeshiva on Ocean Parkway, leading directly thru the recently rebuilt lobby into the Bais Medrash.
The Yeshiva would like to thank all those who have generously assisted the Yeshiva in this monumental project.
[Phase 1 included the rebuilding of the main lobby, bathrooms, locker rooms and Shiur rooms.]